UF integrity testing: pressure decay and broken fibres
The short answer
A pressure decay test (PDT) is the most direct check that a UF rack is intact. You drain one side of the wetted fibres, pressurise it with air to about 100 to 150 kPa (1.0 to 1.5 bar), close the air supply and watch the pressure for 5 to 10 minutes. Water held in the pores of an intact fibre stops the air, so the pressure falls only slowly. A broken fibre or a failed O-ring lets air through, and the pressure falls faster.
Three numbers matter:
Test pressure. About 100 kPa net is enough to push air through a 3 µm breach, the usual design size for Cryptosporidium.
Decay rate, in kPa/min. Trend it. A typical intact rack sits at a low, steady baseline, often 0.1 to 0.5 kPa/min.
Decay limit. The decay rate at which the rack's log removal value (LRV) falls to the value you need, often 4 log for drinking water. Above it, the rack fails the test.
If a rack fails, isolate it, find the leaking module, find the broken fibre and pin it.
How the test works
UF fibres are tested wet. Surface tension holds water in the pores, and air cannot push it out until the pressure reaches the bubble point. For a UF pore of a few hundredths of a micron, the bubble point is far above any test pressure, so an intact fibre passes air only by slow diffusion through the water in its pores.
A breach is different. The pressure needed to clear water from a hole falls as the hole grows:
P = 4 σ cos θ / d
With water at 20 °C (σ about 0.073 N/m), a fully wetting surface (cos θ = 1) and d = 3 µm, P is about 97 kPa. Add any back pressure on the other side of the fibre and that is the minimum test pressure. This is why so many UF plants test at 100 to 150 kPa. Stay below the module's maximum air pressure and transmembrane pressure on the datasheet.
For an out-in fibre such as Stream UF, follow the test procedure for the module. The usual sequence is:
Stop filtration and drain the pressurised side.
Raise the air pressure to the test value.
Let it settle for 1 to 2 minutes, as the fibres stretch and temperatures even out.
Close the air valve and record the pressure for 5 to 10 minutes.
Vent, refill and return to service.
The decay rate is the fall in pressure divided by the hold time.
What the decay rate means: the log removal value
The decay rate on its own is just a pressure. To judge it, convert it into the LRV it proves. The method in the US EPA Membrane Filtration Guidance Manual is widely used:
LRV = log₁₀ [ (Qp × ALCR × Patm) / (ΔPtest × Vsys) ]
Qp: filtrate flow of the rack (L/min).
ALCR: air-liquid conversion ratio. This is how much more air than water passes through the same breach. It depends on the test pressure, the operating transmembrane pressure (TMP) and the flow model. In laminar flow it can be 50 to 100. Regulators may require a lower, more conservative value.
Patm: atmospheric pressure (about 101 kPa).
ΔPtest: decay rate (kPa/min).
Vsys: volume of air held under pressure during the test (L), in the modules and the pipework.
Three practical points follow:
Bigger racks are less sensitive. A larger Vsys spreads the same leak over more air, so a broken fibre gives a smaller decay. This sets a practical limit on rack size where high LRV is required.
The baseline is not zero. Diffusion through intact fibres, valve seats and fittings gives every rack a small decay. Keep the baseline well below the limit.
Temperature matters. Temperature changes during the hold shift the reading. Allow the full settling period.
Worked example
An illustrative rack of Stream UF modules feeds an RO train. The numbers are typical values chosen to show the method:
Filtrate flow: 100 m³/h (1,667 L/min)
Air volume under test: 300 L
Test pressure: 100 kPa; maximum operating TMP: 100 kPa
ALCR: 80 (laminar estimate at 20 °C)
The equation simplifies to LRV = log₁₀ (44,900 / ΔPtest).
Decay rate (kPa/min) | LRV proven | Reading |
|---|---|---|
0.2 | 5.4 | Typical intact baseline |
0.5 | 5.0 | Intact, watch the trend |
1.0 | 4.7 | Investigate if this is a step change |
2.0 | 4.4 | Find and fix the leak |
4.5 | 4.0 | Limit for a 4-log target: the rack fails above this |
A good alarm sits between the baseline and the limit, for example at 1.0 kPa/min here. That gives time to find and pin a fibre before the rack fails. With a more conservative ALCR, the limit is lower; at an ALCR of 20, for instance, the 4-log limit falls to about 1.1 kPa/min. Agree the ALCR and the limits with your regulator or client before commissioning.
Finding a broken fibre
Once a rack fails, work from the rack down to the fibre:
Repeat the test. Rule out a valve that did not seat, an open drain or a leaking air fitting.
Find the module. With the rack pressurised, look at the clear filtrate sight tube or outlet of each module. A steady stream of bubbles marks the leaking module. If the rack has no sight tubes, isolate and test modules one at a time.
Check the seals. A cut O-ring or an unseated end cap leaks like a broken fibre.
Find the fibre. Remove the module and stand it upright. Pressurise the outside of the fibres with air at the test pressure, cover the potted face on the filtrate side with a few millimetres of water and look for a steady line of bubbles from one fibre end. Mark it.
Pin the fibre. Push a tapered stainless steel or plastic pin, of the size the module supplier gives, into the open lumen at the potted face, or seal it with the approved epoxy. Pin both ends if the fibre is open at both ends.
Retest. Repeat the module test, then the rack test, and record the new baseline.
Record every pin: module serial number, date and position. Many operators replace a module once pinned fibres exceed about 1 to 2 % of its fibres, as the lost area also cuts flux.
Why fibres break
One broken fibre in a year is normal wear. Several in a month have a cause:
Sharp debris in the feed. Check the pre-strainer, typically 100 to 300 µm, and its basket.
Pressure shocks from fast-acting valves or a pump start against a closed valve.
Too much air scour or a backwash above the module's limit.
Chemical damage from cleaning outside the limits. See our membrane cleaning limits.
Drying or freezing of stored modules.
What to do
Run a PDT at a fixed frequency: daily in drinking water service, at least weekly on industrial pre-treatment.
Trend the decay rate for each rack, not just pass or fail.
Calculate the decay limit for your LRV target, then set an alarm well below it.
Watch filtrate turbidity continuously as a second check. Typical UF filtrate stays below 0.1 NTU. A rise is a late signal, so do not rely on it alone.
Keep a pin kit and a module test rig on site, and log every repair.
Where the UF feeds an RO, run the RO in Theway Compass with the filtrate quality you measure, and check the UF sizing if a rack is to be split to improve sensitivity.
Questions engineers ask
Is a filtrate turbidity of 0.05 NTU proof that the fibres are intact?
No. One broken fibre among thousands adds too little unfiltered water to move a turbidity meter much. Turbidity is a useful continuous check, but the PDT is what proves the LRV.
Why did the decay rate rise slowly over several weeks without a step?
A gradual drift often comes from a leaking valve seat, a tired O-ring or several small defects, not one broken fibre. Test the valves first, then the modules one at a time.
How many pinned fibres are too many?
There is no single rule. A typical guide is to replace the module once about 1 to 2 % of the fibres are pinned, or sooner if the pins are increasing month by month.
Should I test after every chemical clean?
Yes, it is good practice. A clean outside the limits can damage fibres, and the test confirms the rack before it goes back into service.
Can Theway help set the decay limit for a Stream UF plant?
Yes. Send us your rack layout, filtrate flow, operating TMP and your LRV target, and we will help you set the test pressure, decay limit and alarm for your Stream UF modules.
Specification note: The test pressures, decay rates, ALCR and LRV values in this article are typical or illustrative values, chosen to show the method. They are not measurements from any plant and not a performance guarantee. Follow the test procedure and limits for your modules and your regulator's requirements. See the product and datasheet disclaimer.