At a glance: seawater UF ahead of RO should be designed for the worst sea, not the average: algal blooms, storms that stir up sediment and the warmest summer water. Use a moderate design flux, size trains so the plant keeps running while one train is cleaned, plan chlorine and acid chemically enhanced backwashes, and check pressure limits at the highest water temperature.

UF for seawater RO pre-treatment: sizing a rack with Stream modules

Why UF ahead of seawater RO

Seawater RO membranes foul quickly on fine colloids, algae and organic matter. UF retains them and delivers filtrate with a low, steady SDI, even when the intake water changes from day to day. See silt density index and UF.

Design points for seawater

  • Screening. A fine self-cleaning screen protects the fibres from shell fragments and debris.

  • Coagulant. In-line coagulant dosing helps during algal blooms and high-organic periods.

  • Temperature. Pressure limits fall in warm water. For Stream modules, maximum TMP falls from 100 kPa at up to 20 °C to 80 kPa at 35 to 40 °C, and the datasheet maximum temperature is 45 °C.

  • Biofouling. Seawater carries marine organisms; chlorine CEBs are usually part of the cycle.

  • Scale and metals. Acid CEBs control scale and iron.

  • Corrosion. Non-metallic housings and pipework in contact with seawater. Theway's iRack assembly is built for large seawater pre-treatment plants.

Worked example

Net UF filtrate needed: 200 m³/h for the RO.

Step

Calculation

Result

Recovery assumed

Backwash, flush and CEB losses

92%

Gross filtrate

200 ÷ 0.92

217 m³/h

Design flux

Moderate value for seawater

55 L/m²·h

Area needed

217,000 ÷ 55

3,950 m²

Module

TW 315/1650, 145 m²

27.2, round up

Layout

4 trains of 8 modules

32 modules, 4,640 m²

Flux, all trains running

217,000 ÷ 4,640

47 L/m²·h

Flux, one train in CIP

217,000 ÷ 3,480

62 L/m²·h

Four trains keep the flux moderate even with one train out for cleaning. This is an illustration; a real design starts from your intake water data, and a pilot is worth running for a large plant.

Cleaning plan

  • Backwash every 15 to 60 minutes for 20 to 60 seconds.

  • Chlorine CEB against biofouling; acid CEB against scale and iron.

  • CIP when temperature-corrected permeability falls to the trigger level.

In service

TW-Septa 400-1530 modules treat seawater ahead of RO for the DM plant at a coastal thermal power plant in South India. TW-Septa uses Theway's Septabore seven-bore fibre, built for difficult feed water.

Checklist

  • Intake data for all seasons, including bloom periods

  • Fine screening ahead of UF

  • Coagulant dosing point

  • Design flux moderate, checked with one train offline

  • Pressure limits checked at maximum water temperature

  • Chlorine and acid CEB planned

  • Non-metallic wetted parts

Questions buyers ask

Can UF handle a red tide?

UF retains algal cells, but blooms foul membranes quickly. Coagulant dosing, shorter filtration cycles and more frequent CEBs keep the plant running.

Is a cartridge filter still needed before RO?

Many plants keep one as a safety barrier against debris from tanks and pipework.

Out-in or multi-bore fibre for seawater?

Both are used. Septabore's seven-bore fibre adds strength on difficult feeds. See single bore vs multi bore.

Size your seawater UF

Send intake data and RO feed flow through Send Enquiry or to mail@thewaymembranes.com. See also UF for Gulf desalination plants.

Specification note: figures are typical values for information only and are not a performance guarantee. Actual performance depends on the feed water, pretreatment and operation. See the product and datasheet disclaimer.

Comments


bottom of page