Backwash, CEB and CIP: the three cleaning levels in a UF plant

Nov 12
2 min read

Updated: 3 hours ago

At a glance: a UF plant cleans at three levels. A backwash reverses filtrate through the fibres every 15 to 60 minutes and lifts off the cake. A chemically enhanced backwash (CEB) adds a cleaning chemical to some backwashes, typically daily to weekly, to control organic and biological fouling or scale. A clean in place (CIP) recirculates stronger chemicals when backwash and CEB no longer restore TMP.

Backwash, CEB and CIP: the three cleaning levels in a UF plant

The three levels

Level

How often

How long

Chemicals

Purpose

Backwash

Every 15 to 60 min

20 to 60 s

None

Removes the cake of particles from the fibre surface

Forward flush

With each backwash

20 to 60 s

None

Sweeps loosened solids out of the module

CEB

Daily to weekly

Minutes, including soak

Oxidant, alkali or acid

Controls organic, biological and scale fouling

CIP

When triggered by data

An hour or more

Stronger alkali, oxidant and acid

Restores permeability when CEB is not enough

Backwash and flush times are the Theway Stream and retrofit datasheet ranges. CEB and CIP frequencies depend on the feed water.

Backwash

Filtrate is pumped from the filtrate side back through the fibres at a backwash flux of 40 to 150 L/m²·h and a pressure no higher than 2 kg/cm². This lifts the cake off the outside of out-in fibres. Air scouring before or during the backwash helps on dirty feeds. See air scouring explained.

Too short or too gentle a backwash leaves cake behind and TMP creeps up. Too long or too frequent wastes water and lowers recovery.

Chemically enhanced backwash

A CEB doses a chemical into the backwash water, lets the module soak for a few minutes, then rinses. Common choices:

  • sodium hypochlorite against organic and biological fouling

  • sodium hydroxide against organics and oils

  • acid (citric or hydrochloric) against scale and metal oxides

Many plants alternate an oxidant or alkaline CEB with an acid CEB.

Clean in place

A CIP recirculates stronger solutions, often warmed, through the feed side, with soaks between. It is triggered by data, not by the calendar. See CIP for hollow fibre UF.

Setting the levels for your plant

  1. Start with the datasheet middle: filtration around 30 min, backwash around 40 s.

  2. Watch how TMP recovers after each backwash.

  3. If TMP creeps up between CEBs, shorten filtration time or add a CEB.

  4. If CIPs come too often, reduce flux or improve pre-treatment before adding chemicals.

Checklist

  • Backwash flux and pressure within limits

  • Filtration and backwash times within datasheet ranges

  • CEB chemicals matched to the foulant

  • CIP triggered by permeability, not by date

  • Recovery calculated including all backwash and CEB water

Questions buyers ask

Should backwash water be filtrate or feed?

Filtrate. Feed water would load the inside of the fibre with particles.

Does every plant need a CEB?

No. Clean well water may manage with backwash and occasional CIP. Surface water, seawater and effluents nearly always need CEB.

How much water does backwashing use?

It depends on flux, time and frequency. See UF flux explained for a worked recovery calculation.

Need help setting cycles?

Send your operating data through Send Enquiry or to mail@thewaymembranes.com. Module data is on the Stream UF page.