Backwash, CEB and CIP: the three cleaning levels in a UF plant
Updated: 3 hours ago
At a glance: a UF plant cleans at three levels. A backwash reverses filtrate through the fibres every 15 to 60 minutes and lifts off the cake. A chemically enhanced backwash (CEB) adds a cleaning chemical to some backwashes, typically daily to weekly, to control organic and biological fouling or scale. A clean in place (CIP) recirculates stronger chemicals when backwash and CEB no longer restore TMP.

The three levels
Level | How often | How long | Chemicals | Purpose |
|---|---|---|---|---|
Backwash | Every 15 to 60 min | 20 to 60 s | None | Removes the cake of particles from the fibre surface |
Forward flush | With each backwash | 20 to 60 s | None | Sweeps loosened solids out of the module |
CEB | Daily to weekly | Minutes, including soak | Oxidant, alkali or acid | Controls organic, biological and scale fouling |
CIP | When triggered by data | An hour or more | Stronger alkali, oxidant and acid | Restores permeability when CEB is not enough |
Backwash and flush times are the Theway Stream and retrofit datasheet ranges. CEB and CIP frequencies depend on the feed water.
Backwash
Filtrate is pumped from the filtrate side back through the fibres at a backwash flux of 40 to 150 L/m²·h and a pressure no higher than 2 kg/cm². This lifts the cake off the outside of out-in fibres. Air scouring before or during the backwash helps on dirty feeds. See air scouring explained.
Too short or too gentle a backwash leaves cake behind and TMP creeps up. Too long or too frequent wastes water and lowers recovery.
Chemically enhanced backwash
A CEB doses a chemical into the backwash water, lets the module soak for a few minutes, then rinses. Common choices:
sodium hypochlorite against organic and biological fouling
sodium hydroxide against organics and oils
acid (citric or hydrochloric) against scale and metal oxides
Many plants alternate an oxidant or alkaline CEB with an acid CEB.
Clean in place
A CIP recirculates stronger solutions, often warmed, through the feed side, with soaks between. It is triggered by data, not by the calendar. See CIP for hollow fibre UF.
Setting the levels for your plant
Start with the datasheet middle: filtration around 30 min, backwash around 40 s.
Watch how TMP recovers after each backwash.
If TMP creeps up between CEBs, shorten filtration time or add a CEB.
If CIPs come too often, reduce flux or improve pre-treatment before adding chemicals.
Checklist
Backwash flux and pressure within limits
Filtration and backwash times within datasheet ranges
CEB chemicals matched to the foulant
CIP triggered by permeability, not by date
Recovery calculated including all backwash and CEB water
Questions buyers ask
Should backwash water be filtrate or feed?
Filtrate. Feed water would load the inside of the fibre with particles.
Does every plant need a CEB?
No. Clean well water may manage with backwash and occasional CIP. Surface water, seawater and effluents nearly always need CEB.
How much water does backwashing use?
It depends on flux, time and frequency. See UF flux explained for a worked recovery calculation.