At a glance: flux is the filtrate flow per square metre of membrane, in L/m²·h (LMH). A datasheet gives a range, such as 20 to 100 LMH for Theway Stream modules. The design flux for your plant sits inside that range: towards the top on clean, cool well water and towards the bottom on effluents and difficult surface water. A lower design flux means more membrane but fewer cleans and longer life.

UF membrane flux explained: design flux, recovery and sizing

Flux, gross and net

  • Gross flux: total filtrate produced divided by membrane area.

  • Net flux: filtrate delivered after backwash water is taken out.

  • Recovery: net filtrate divided by feed water used.

Choosing a design flux

Feed water

Where design flux usually sits

Clean groundwater, low turbidity

Upper part of the range

Surface water after screening

Middle of the range

Surface water with monsoon turbidity spikes

Lower-middle; design for the worst season

Seawater

Lower-middle; allow for algal blooms and warm water

Secondary-treated sewage or industrial effluent

Lower part of the range

A pilot is the surest way to set flux on unusual water. See the merits of piloting.

Worked example

A plant needs 50 m³/h of net filtrate.

1. Allow for backwash losses. Assume 92% recovery for now. Gross filtrate = 50 ÷ 0.92 = 54.3 m³/h.

2. Choose a design flux. Surface water after screening: 60 LMH.

3. Area needed. 54,300 L/h ÷ 60 LMH = 905 m².

4. Choose modules. TW 250/1650 has 80 m²: 905 ÷ 80 = 11.3, so 12 modules (960 m²). The actual flux is 54,300 ÷ 960 = 57 LMH. Alternatively, seven TW 315/1650 modules at 145 m² give 1,015 m² and 53 LMH.

5. Check recovery. With 12 × TW 250/1650:

  • filtration 30 min: 54.3 × 0.5 = 27.2 m³ of filtrate per cycle

  • backwash 40 s at 150 LMH: 960 m² × 150 LMH = 144 m³/h, × 40/3,600 h = 1.6 m³

  • forward flush 30 s at feed flow: about 0.45 m³ of feed

  • recovery = (27.2 − 1.6) ÷ (27.2 + 0.45) = 93%

That is close to the 92% assumed, so the sizing holds. CEB and CIP water lower recovery a little further.

6. Add a standby. Plants that must run while one train is cleaned need extra area or an extra train.

Checklist

  • Design flux chosen from feed water, not the top of the datasheet range

  • Gross flow includes backwash and flush losses

  • Module count rounded up, actual flux recalculated

  • Recovery checked with real cycle settings

  • Standby capacity for cleaning

  • Cold-season flow checked

Questions buyers ask

Can I run at 100 LMH?

On very clean water for short periods, perhaps. Most plants foul quickly at the top of the range and need more cleaning.

Why does output drop in winter?

Water is more viscous when cold, so flux falls at the same TMP. See TMP explained.

What flux do MBR membranes run at?

Much lower. Submerged modules run under suction at low TMP, so their flux sits well below the pressurised range; for TW-MBR modules the design figure depends on site conditions.

Where can I read more about sizing?

Get your plant sized

Send flow and feed water data through Send Enquiry or to mail@thewaymembranes.com.

Specification note: figures are typical values for information only and are not a performance guarantee. Actual performance depends on the feed water, pretreatment and operation. See the product and datasheet disclaimer.

Comments


bottom of page