At a glance: Theway's Puran modules replace Hydranautics HYDRAcap 40A and 60A, and Puran Max modules replace HYDRAcap MAX 40, 60 and 80. All five are equivalence level 8, Theway's closest match: operating philosophy, form, ports, dimensions, membrane material, MWCO, fibre and performance. They fit the existing housings and racks and run on the existing control sequence.

Replacing Hydranautics HYDRAcap UF modules: Puran and Puran Max

A HYDRAcap MAX replacement in service

Theway Puran Max modules replacing HYDRAcap MAX at a refinery
Puran Max modules in place of HYDRAcap MAX, refinery, North India

A refinery in North India replaced its HYDRAcap MAX modules (105 m², TIPS fibre) with Theway Puran Max in 2025. It treats about 4 MLD of refinery effluent ahead of RO with filtrate turbidity below 1 NTU and SDI below 3. Photos and details.

Model cross-reference

Existing module

Theway retrofit

Area (m²)

MWCO

Level

HYDRAcap 40A

30

100 kDa

8

HYDRAcap 60A

46

100 kDa

8

HYDRAcap MAX 40

52

150 kDa

8

HYDRAcap MAX 60

78

150 kDa

8

HYDRAcap MAX 80

105

150 kDa

8

Brand and model names belong to their owners and are used here only to identify the modules each Theway retrofit replaces.

Puran and Puran Max data

Parameter

Value

Membrane

PES (Puran) or TIPS PVDF (Puran Max), hollow fibre

Fibre

1.2 mm OD × 0.6 mm ID

Housing

uPVC, PVC or PP caps, proprietary epoxy potting

Feed pressure

3 kg/cm² maximum

Transmembrane pressure

1 kg/cm² maximum

Backwash pressure

2 kg/cm² maximum

pH, cleaning

1 to 13

Temperature

20 to 45 °C (Puran); 20 to 50 °C (Puran Max)

Feed flux

20 to 100 L/m²·h

Backwash flux

40 to 150 L/m²·h

In service

Puran Max modules treat refinery effluent ahead of RO at a refinery in North India, where feed quality varies widely and carries oil traces, COD and suspended solids.

Changeover steps

  1. Note the model and quantity from the nameplates and photograph the module ends and rack.

  2. Send recent operating data and cleaning history so we can see why the old modules are being replaced.

  3. Replace a full train at a time, so every module in the train starts with the same permeability.

  4. Inspect and replace worn couplings and O-rings.

  5. Flush the preservative to drain before sending filtrate to RO. See commissioning new UF modules.

  6. Record flow, TMP and temperature on day one as the baseline.

Checklist

  • Model and quantity confirmed from nameplates

  • Photos of ports and rack sent

  • Cycle settings and chemicals checked against datasheet limits

  • Spare seals on site

  • Drain route for flush water

  • Baseline readings planned

Questions buyers ask

Will the control sequence need changing?

Level 8 includes operating philosophy, so the existing sequence normally stays. We check the settings with you before start-up.

Why is Puran Max rated at 150 kDa?

The MWCO matches the duty of the modules it replaces and gives higher permeability on water treatment duties.

Can I order a few modules to replace failed ones?

Yes, but within one train we advise replacing all modules together for even flow sharing.

Do you hold stock?

Ask for lead time on your models when you enquire.

Retrofit guides by maker

Get a retrofit quotation

Send model, quantity and photos through Send Enquiry or to mail@thewaymembranes.com. All Theway retrofits are listed on the direct retrofit page.

Specification note: figures are typical values for information only and are not a performance guarantee. Actual performance depends on the feed water, pretreatment and operation. See the product and datasheet disclaimer.

Comments


bottom of page